Products - World of Wind
01:40 In the design process, all factors are taken into account, from foundation, production and sourcing to commissioning and service.
|
01:10 The V164-7.0 MW is 100% dedicated to offshore and optimised for the conditions in the North Sea.
|
02:46 Through the Vestas Performance and Diagnostic Centre, Vestas continuously monitors 16,000 turbines to better understand the wind and predict failures.
|
|
02:45 Through the Vestas Performance and Diagnostic Centre, Vestas continuously monitors 16,000 turbines to identify any abnormalities that might signal a potential future failure.
|
01:14 The V112-3.0 MW Offshore turbine is optimised to take full advantage of the wind conditions at sea.
|
01:49 Vestas always seeks to reduce the time and cost of servicing and, hereby, maximise turbine uptime.
|
01:58 The V112-3.0 MW has been specifically designed to take full advantage of lower wind sites.
|
01:33 In terms of weight, height and width, the V112-3.0 MW is designed to be easily transported to any site in the world.
|
02:15 The V112-3.0 MW delivers the most competitive cost of energy for low to medium wind sites.
|
||
02:20 Offshore wind must play an increasingly central role if governments are to meet their climate change obligations.
|
01:40 Design Strategy for the V164-7.0 MW explained by Albert Winnemuller, Chief Project Manager, Vestas Technology R&D
|


